 |
|
 |
Port of Seattle Continued...
Global Gateway North
Terminal Information
Gate:
- 12 entry/exit lanes 6 dedicated in-gate; 4 reversible; 2 dedicated
out-gate lanes
- 8 scales for exports/outbound loads
- Dedicated trucker help desk
- Large off-street queuing area
Berths:
- 3 berths, totaling 2,900 feet 2,000 feet at a depth of 50 feet;
900 feet at a depth of 45 feet
- 6 post-Panamax Plus container cranes 3 cranes are elevated to
accommodate 6-high, on-deck stowage at any tidal condition
- Back reach area capable of handling break bulk and heavy-lift cargo
- Capability of working cargo from box cars and gondola cars at adjacent Transit
Shed
On-Dock Rail:
- 30 acres, 6 working tracks
- Overall capacity for 54 double-stack railcars, plus adjacent dedicated storage
for an additional 54 railcars
Container Yard:
- 190 acres
- Wheeled and grounded operations, ability to reconfigure wheeled and grounded
areas as necessary
- On-site maintenance and repair shop for containers, reefer equipment, and
chassis
- 80,000 sq. foot Transit Shed with adjacent rail spur
- 7 top-picks for grounded and on-dock rail operations
- 600 reefer plugs, with reefer monitoring available 24/7
- A fleet of 70 yard tractors
|
|
 |